To: CEC/DE Executive Committee
From: Stephen Johns
Date: July 21, 2009
Re: NCC Partnering Meeting Minutes – July 13, 2009
![]()
At 2:00 PM on Monday, July 13, 2009, the NCC Partnering Committee met with New Castle County’s Land Use Department. The following topics were discussed:
1.
Enhanced Review (Two Step) Process Ordinance – This ordinance is expected to be introduced
during the last week in July. It
is expected to take effect January 1st, 2010.
2.
“Smart Code” Ordinance - This ordinance was
introduced during the week of July 6th. It is expected to be passed by Council in late August or
September.
3.
“BRAC” Amendments
– The County expects to introduce an ordinance to enhance opportunities
for mixed use development after the “Smart Code” ordinance is approved.
4.
Small Business Incentives – The County expects to introduce an ordinance providing
incentives for small businesses in August.
5.
Omnibus Ordinances
– The County is working on two omnibus ordinances making minor changes
such as modest landscape requirement reductions, and other clarifications. They will provide these to us for our
comments before they are introduced.
6.
Sign Code Ordinance
– Ted Williams is leading a committee that is working on a complete
review and revision of the sign code.
7.
Construction Shutdowns – Mike Clar is finalizing the policy and it is expected to be
effective soon. We will need to
add notes to our plan referencing the requirements of the policy. We suggested the County review this
ordinance with the DCA and HBA since they will be significantly impacted. They thought that was a good idea and
will do that at their next “Nuts and Bolts” meeting.
8.
Sediment & Stormwater Checklist – We reviewed the new checklist and John
Gysling is making final revisions.
9.
Electronic CCR Reviews – The County hopes to have a workshop on the process for the
CCR’s and engineers in August and implement electronic reviews in
September. The County will work on
allowing us to print the electronic page after we have entered the review information,
for our record and distribution.
10.
Introduction of Rain Tank Construction Check List – We reviewed a few comments on this
checklist.
11.
Submission of complete applications for all stages of
review – We reviewed ideas on
improved submission requirements, including having each submission be separated
into separate packages for the separate divisions. We also discussed New Castle County developing a detailed
list of what was required for each type of submission.
12.
Finalization the UDC definitions for Non-delineated
floodplain, Drainage-way, Swale, and Riparian Buffer Area (as it relates to a
watercourse) – New Castle County
distributed proposed revisions to definitions. We will review and discuss at the next meeting (see
attached).
13.
Release of the trial procedure for bio-retention
with in-situ soils (see attached) –
We reviewed the County’s proposed procedures.
14.
Re-inspection Policy
– The County presented their policy for re-inspections including fee
requirements (see attached).
15.
Next Meeting
– The next scheduled meeting with Land Use will be held on September 14,
2009 (to eliminate conflicts with Labor Day) at 2:00 PM, in the Land Use
office.